Bassetts Bridge Staircase

    • Rail
Client Requirements
A new access point was required from the Network Rail depot down to the line near Bassetts Bridge.
The Solution
Waux fabricated a GRP embankment staircase to provide safe access to the track.
Project Delivery
Once fabricated, the staircase was installed on concrete foundations, with dig-in posts supporting the stringers.
Project Area
Wigston, Leicestershire
Type
Rail Trackside
Project Journey

Network Rail has been upgrading sites around the country to improve safety for its site operatives working near the live rail. A new build staircase was required near Bassetts Bridge, in Wigston, which led from the rail depot down to the tracks.

GRP was specified as the build material for the staircase, a common choice in the Rail Industry due to the non-conductive properties and other benefits that it offers.

After quoting and winning the project, Waux worked closely with the main contractor and MHB Consultants to close out any design queries ready for sign-off.

Once approved by the main contractor, the access structure was manufactured in our workshop then delivered to site in prefabricated units once the client was ready for installation.

In simple kit form, the GRP staircase was quickly installed, meaning operatives could use the new access point within hours of delivery.

After project completion, Waux continued to assist the client with the handover documentation, who decided to take advantage of our Warranty Policy.

“The steps are all fitted and look great!”
(Site Manager, Tier 1 Contractor)

Does this look like how we can help you?

GET IN TOUCH WITH US FOR FREE PROFESSIONAL ADVICE AND PROJECT REQUIREMENTS







    Sign up to receive industry-focused insights, latest projects and new product launches

      By submitting your details, you are agreeing to our Privacy Policy