Hilsea Footbridge Refurbishment
For the Hilsea Footbridge Refurbishment, the architect, working on behalf of the engineering contractor, wished to upgrade the DDA vision and AFA access to this station building and the over bridge.
Using the VulcaGR!P® Range, everything was delivered to site cut to size and drilled ready for rapid installation and to enable little passenger disruption.
We worked closely with the bridge team, carrying out the working drawing surveys, enabling us to advise on fixing details, water drainage and installation procedures, ensuring all end results met the high standards expected. Waux worked carefully with the contractors, ensuring everything was on site, on time and on budget.
FREE SITE
SURVEYS & ADVICE
SUPPLIED TO
EXACT REQUIREMENTS
COMPLETED
ON TIME
LITTLE PASSENGER
DISRUPTION
Does this look like how we can help you?
GET IN TOUCH WITH US FOR FREE PROFESSIONAL ADVICE AND PROJECT REQUIREMENTS
Sign up to receive industry-focused insights, latest projects and new product launches